Innovative design solutions proving popular to T5 Retailers

May 2008

Working with BAA, Carter Synergy have led the way with a design solution to meet very exacting environmental and energy requirements for the Clients signing up to some 150 outlets in the terminal.

Artists impression of the new T5 Building.

Due to open in March 2008, T5 construction site is the size of London's Hyde Park and the terminal building could house 10 football pitches on each of its five floors. With the energy centre located in an industrial "shed" away from the terminal building, services design was always going to be a challenge.

The terminal is served with a chill water circuit from four 6.6 MW ammonia chillers delivering water at 6C.

Our solution for the Clients signing up to the outlets was integral water-cooled plant connected into the chill water circuit. In conjunction with CRE cabinets and plant were tested, approved by BAA, and promoted to interested Clients

Clients:

  • Apostrophe
  • Bagel St
  • Caviar House & Prunier
  • Eat
  • Harrods
  • M&S Simply Foods
  • Pret a Manger
  • Wagamama
  • WH Smith

Back to News

For further information about this project or to discuss your requirements, feel free to get in touch.

Call +44 (0)121 250 1000 or email us to schedule a friendly consultation.